Bhutan's Punatsangchhu-I dam: due 2015, still unfinished after a 7-year halt

₹93,755,700,000

Bhutan · Government of India (MEA) · 2008–present · Punatsangchhu-I Hydroelectric Project Authority (India–Bhutan)

Launched in November 2008 with commissioning due in November 2015, the India-funded Punatsangchhu-I hydro project was hit by geological problems; right-bank slope instability at the dam from 2013 led to dam works being suspended in 2019, and work resumed only after a seven-year halt.

Rs 9,375.57 crore is the Cabinet-approved cost at December 2013 prices; a higher revised estimate is under examination. Funded 40% grant, 60% loan.

Sources: The Tribune: After 7-yr halt, work starts on Bhutan's largest hydel project

A dam built on a hillside that keeps moving, much like the deadline.

Verified

Kaladan transit project in Myanmar: 5x over budget, road still unbuilt

₹29,040,400,000

Myanmar · Ministry of External Affairs · 2008– · Myanmar (grant assistance)

India's cabinet approved a port at Sittwe, a river terminal at Paletwa and a road to the Indian border as a grant to Myanmar. The port was finished around 2016, but the first Indian cargo ship didn't arrive until May 2023, and as of mid-2024 the road still hadn't been built amid Myanmar's civil war.

Approved at Rs 535.91 crore in 2008; revised to Rs 2,904.04 crore (about 5.4x) in 2015. A grant, not a loan.

Sources: Prime Minister's Office: revised cost estimate Rs 2,904.04 crore · MP-IDSA: Kaladan amid Myanmar's civil war (July 2024)

Sixteen years, five times the budget, and the road to India still doesn't reach India.

Verified

Afghan dam's cost balloons from Rs 352 crore to about Rs 1,700 crore

₹17,000,000,000

Afghanistan · Ministry of External Affairs (executed by WAPCOS) · 2004–2016 · Government of Afghanistan (Herat province)

The Cabinet approved the Salma (Afghan-India Friendship) Dam in November 2004 at Rs 351.87 crore with completion due in December 2008; by 2010 a revised estimate of Rs 800.85 crore plus escalation was before the Cabinet. It was finally inaugurated in June 2016 at a reported cost of about Rs 1,700 crore, five years before the Taliban returned to power.

Final cost reported as about Rs 1,700 crore at the 2016 inauguration; the Cabinet originally approved Rs 351.87 crore in 2004 for completion by December 2008.

Sources: Lok Sabha Unstarred Q.6378 (5 May 2010), via MP-IDSA: Cost and time overruns of projects · Business Insider India: Modi, Ghani inaugurate Rs 1,700 crore Afghan-India Friendship Dam

Built for a republic, handed over to an emirate.

Verified

A parliament building for Afghanistan, six years before the Taliban moved in

₹9,700,000,000

Afghanistan · Government of India · 2005–2015 · Government of Afghanistan

India built Afghanistan's parliament building for Rs 970 crore, inaugurated by Prime Minister Modi in December 2015, alongside the Salma Dam and the Zaranj–Delaram highway. The Taliban took Kabul in August 2021 and dissolved the parliament.

Rs 970 crore for the parliament building, part of more than US$3 billion India committed to Afghanistan.

Sources: Factly: India's investments in Afghanistan (Lok Sabha data) · ThePrint: will India's Afghan investments amount to anything?

India built a parliament for a country that stopped having one.

Verified

$7.4 billion of Indian credit lines to Bangladesh, 23% disbursed after 14 years

$7,362,000,000

Bangladesh · Government of India (Lines of Credit via Exim Bank of India) · 2010–2024 · Government of Bangladesh

The Financial Express reported in August 2024, citing ERD sources, that only US$1.73 billion of the Indian LoC funds had been disbursed, 'only 23 per cent of the total outlay', with railway projects such as Khulna-Mongla ($399M) and Kulaura-Shahbazpur ($78.1M) slow; the terms require at least 75 per cent of a project's goods and services to be bought from India.

Concessional loans, not grants: sum of three lines of credit ($862M in 2010, $2B in 2016, $4.5B in 2017). Only $1.73B had been disbursed by August 2024, per Bangladesh's Economic Relations Division sources.

Sources: The Financial Express (Dhaka): Only 23pc funds disbursed in 14yrs

A loan that mostly exists as a press release and an order form for Indian suppliers.

Verified

$640M for Ethiopian sugar plants, years late amid contractor feuds

$640,000,000

Ethiopia · Exim Bank of India · 2007–2014 · Ethiopian Sugar Corporation; contractor Overseas Infrastructure Alliance (India)

Ethiopia's Tendaho sugar project, built by Indian contractor Overseas Infrastructure Alliance on a $640 million Exim Bank of India loan signed in 2007, ran years behind schedule. Ethiopia's Sugar Corporation chief blamed the Indian firms for disputes, vendor choices and unpaid local wages.

Loan (line of credit), not a grant. About $400M was for Tendaho; the rest for expanding Fincha and Wonji factories.

Sources: Horn Affairs: Ethiopia: Tendaho Sugar to be inaugurated, Indians blamed for delay

Exporting Indian contractors along with the credit line was the whole point; exporting sugar was optional.

Verified

A $192 million airstrip and jetty for an island of 300 people

$192,000,000

Mauritius (Agalega) · Government of India · 2015–2024 · Government of Mauritius

A 3 km airstrip and jetty on Agalega, an island of about 300 inhabitants, were inaugurated on 29 February 2024; Mauritius's prime minister denied reports that the facilities would serve as an Indian military base.

8.8 billion Mauritian rupees (about US$192 million) per AFP/VOA; reported as Indian-financed, agreed during the 2015 Modi visit. VOA does not state whether grant or loan.

Sources: VOA Africa: Mauritius launches India-funded air strip in Agalega

Roughly $640,000 of runway per islander, and definitely nothing to do with warships.

Verified

A Gandhi-branded convention centre for Niger's summit

$35,480,000

Niger · Ministry of External Affairs · 2018–2020 · Government of Niger

India provided a $35.48 million grant towards the $56 million Mahatma Gandhi International Convention Centre in Niamey, built to host an African Union summit and inaugurated in January 2020. Niger's elected government was overthrown in a military coup in 2023.

Grant. India paid $35.48M of the $56M project; Niger paid the remaining $20.52M.

Sources: Business Standard (PTI): Jaishankar inaugurates first convention centre in Niger made by India · The EastAfrican: How India helped Niger play host of the AfCFTA summit

Nonviolence-themed event space, now available for junta functions.

Verified

A $35M sugar factory in Ghana that shut weeks after opening

$35,000,000

Ghana · Exim Bank of India · 2016–2018 · Government of Ghana / Komenda Sugar Factory

The Komenda Sugar Factory, built for $35 million with an Indian Exim Bank facility, was inaugurated in May 2016 and closed a few weeks later for lack of sugar cane; it was still shut in March 2018. A study found it needed about 300,000 tonnes of cane but could source only 16,000 tonnes nearby.

Loan (Exim Bank of India facility), not a grant. A further $24.5M Exim credit was sought in 2017 for cane plantations to feed the idle plant.

Sources: Graphic Online: Komenda Sugar Factory still shut two years after inauguration

Nothing says sweet partnership like a sugar mill with no sugar cane.

Verified

Financing a presidential palace in Ghana

$30,000,000

Ghana · Exim Bank of India · 2005–2008 · Government of Ghana (Flagstaff House / Jubilee House)

The Export-Import Bank of India extended a $60 million loan to Ghana, about $30 million of which was earmarked for a new presidential residence at Flagstaff House, now known as Jubilee House.

Loan, not a grant: about $30M of a $60M Exim Bank of India loan was for the presidential residence; the other $30M was for rural electrification.

Sources: Modern Ghana: 30 million loan for presidential house

Development finance, executive-suite edition.

Verified

A $27M parliament building for The Gambia's Jammeh era

$27,000,000

The Gambia · Exim Bank of India · 2008–2014 · Government of The Gambia

The Gambia's first purpose-built National Assembly complex, inaugurated in October 2014 under then-President Yahya Jammeh, cost $27 million financed through a loan from the Exim Bank of India.

Loan from Exim Bank of India, not a grant.

Sources: The Point (Gambia): Gambia gets first specially built National Assembly

Nothing guarantees parliamentary democracy like a nicer parliament building.